The investment property consists of nine apartments (seven of which have been fully renovated). There is also a restaurant equipped with professional-grade equipment, which is currently vacant.
The building is located on a quiet street in Twann, near Lake Biel. The village is situated on a busy highway between the cities of Biel and Neuchâtel. The garden at the rear of the building offers a panoramic view of the vineyards, and there are superb hiking trails in the hills above the village. The village's elementary school is located near the building, a 2-minute walk away.
A ramp for people with disabilities has been installed to provide access to the second floor. The property has been renovated, is regularly maintained, and is in excellent condition. The building comprises a 6.5-room duplex, two 4.5-room apartments, one 3.5-room apartment, two 2.5-room apartments, one 2-room apartment, and two studios. All units are currently rented.
Major renovations to the heating system have been undertaken, including the replacement of several main heating pipes.
The underfloor heating system has just been renovated, and the burner has undergone a complete overhaul. A district heating project is under consideration, with commissioning scheduled for between 2027 and 2028.
The building is located on a quiet street in Twann, near Lake Biel. The village is situated on a busy highway between the cities of Biel and Neuchâtel. The garden at the rear of the building offers a panoramic view of the vineyards, and there are superb hiking trails in the hills above the village. The village's elementary school is located near the building, a 2-minute walk away.
A ramp for people with disabilities has been installed to provide access to the second floor. The property has been renovated, is regularly maintained, and is in excellent condition. The building comprises a 6.5-room duplex, two 4.5-room apartments, one 3.5-room apartment, two 2.5-room apartments, one 2-room apartment, and two studios. All units are currently rented.
Major renovations to the heating system have been undertaken, including the replacement of several main heating pipes.
The underfloor heating system has just been renovated, and the burner has undergone a complete overhaul. A district heating project is under consideration, with commissioning scheduled for between 2027 and 2028.