This property doesn't exist anymore
Commercial
- 136 m2
For rent, Office space, 1630 Bulle, Réf 91412
MARCHANDE STREET IN THE HEART OF A SMALL RESIDENTIAL RESIDENTIAL VILLAGE IN THE CITY CENTER OF BULLE, LIAISON BETWEEN GRAND-RUE AND GRUYERE-CENTER
New buildings of quality. Labeled Minergie, located close to major shopping centers, close to public transport, close to motorway access.
LOCATION:
Real estate complex located along the road (road Riaz), very busy, frequented as much by the inhabitants of the region as by visitors from Friborg:
- 2.5 km from access to the A12
- 700 m from the train station
- Close to the bus stop
- 450 m from the city center
- Many shops located around
- On the transit route of the students of the Orientation Cycle, College du Sud and Vocational School, a pool of approx. 3,500 students
POPULATION AT THE END OF DECEMBER 2016:
- City of Bulle / La Tour-de-Trême: 22'698 inhabitants
- District of Gruyère: 53'637 inhabitants
DESCRIPTION:
- Modular commercial surfaces entirely glazed on one face, even on two sides
- WC fully fitted in each surface
- Offices on the 1st floor very bright
- Rooms accessible to people with reduced mobility
- Individual ventilation by surface
- Light box made available by the owner, ready to receive logos and / or registration
- Canvas blind provided by the lessor
- Private depots and parking spaces for rent
- Public parking in the building, 35 places until 2020, 50 places from 2020
- Real estate complex consisting of 109 housing units up to 2020 and 153 housing units upstairs from 2020
- Private places in the underground car park for rent
- Small deposits for rent
COMMERCIAL SURFACES WITH DISPLAYS
FROM 58 M² TO 1'164 M², TOTAL 3'246 M², DIVISIBLE
ADMINISTRATIVE SURFACES FROM 62 M² TO 463 M², TOTAL 954 M², DIVISIBLE
ROOMS REPLACED IN THE RAW STATE (WITHOUT FINAL FLOOR COVERINGS, WALLS AND CEILINGS, OR INTERNAL ELECTRICITY OR LUMINAIRES), VAT IN SUCH, AS FOLLOWS:
Building A: delivery of premises in the raw state from February 1, 2018
Building B: delivery of premises in the raw state from 1 November 2017.
Building D: delivery of the premises as of June 1, 2018.
Building F: local delivery in the rough at the end of 2019 - beginning of 2020.