Willkommen bei Steetbox Otelfingen – dem neuen, modernen Standort für Gewerbe, Handwerk und Dienstleistung in Otelfingen: Otelfingen – Streetbox.
A total of 83 commercial boxes will be built here by the end of 2027, offering your business the flexibility it needs.
Impressive details:
Construction work for Stage A has already begun. The boxes in Stage B/C are expected to be ready for occupancy from January 16, 2028.
Streetbox Otelfingen offers ideal conditions for companies looking for a functional, well-connected and future-proof location.
We would be happy to advise you on the various options and look forward to hearing from you.
Changes in design, areas, equipment, rental prices, dates as well as construction and project status are reserved.
The impressions listed (visualizations and photos) are protected by copyright and may not be used by third parties. Changes are reserved.
A total of 83 commercial boxes will be built here by the end of 2027, offering your business the flexibility it needs.
Impressive details:
- Timber frame construction
- Ground-level access: 4m x 4m door, manually operated
- Floor loading; Ground floor: 1'000 kg/m², Upper floor: 300 kg/m²
- Floor covering; Ground floor: Monobeton, Upper floor: Beech planks
- Room height; Ground floor: 4.65m, Upper floor: 2.85m
- Water connection
- Electrical distribution: Each box with RCD, 20A and triple socket (ground and upper floor), separate meter available
- Balcony on the upper floor with picket railing, accessible via the office space on the upper floor
- Fiber optic connection
- Heated (district heating)
- Windows: Triple-glazed
- Shared toilets for men and women available, tenants can install their own sanitary facilities within the box
- A mailbox is available for each box at the main entrance
- Container for paper/cardboard and residual waste is available
- The boxes are rented off-plan. Viewings will be possible at a later date.
- Use as a car garage (workshop, preparation etc.) or for the sale of vehicles is not permitted.
Construction work for Stage A has already begun. The boxes in Stage B/C are expected to be ready for occupancy from January 16, 2028.
Streetbox Otelfingen offers ideal conditions for companies looking for a functional, well-connected and future-proof location.
We would be happy to advise you on the various options and look forward to hearing from you.
Changes in design, areas, equipment, rental prices, dates as well as construction and project status are reserved.
The impressions listed (visualizations and photos) are protected by copyright and may not be used by third parties. Changes are reserved.