Welcome to Steetbox Otelfingen – the new, modern location for trade, crafts, and services in Otelfingen: Otelfingen – Streetbox.
A total of 83 commercial units will be built here by the end of 2027, offering your business the necessary flexibility.
Impressive details:
Construction work for Stage A has already begun. The units in Stage B/C are expected to be ready for occupancy from January 16, 2028.
Streetbox Otelgfingen offers ideal conditions for companies looking for a functional, well-connected, and future-proof location.
We would be happy to advise you on the various options and look forward to hearing from you.
Changes in execution, areas, equipment, rental prices, dates, as well as construction and project status remain subject to change.
The impressions listed (visualizations and photos) are protected by copyright and may not be used by third parties. Changes remain subject to change.
A total of 83 commercial units will be built here by the end of 2027, offering your business the necessary flexibility.
Impressive details:
- Timber frame construction
- Ground-level access: Gate 4m x 4.15m, manually operated
- Floor loading; Ground floor: 1,000 kg/m², Upper floor: 300 Kg/m²
- Floor covering; Ground floor: Monobeton, Upper floor: Beech battens
- Room height; Ground floor: 4.65m, Upper floor: 2.85m
- Water connection
- Electrical distribution: Each unit with RCD switch, 20A and triple socket (ground and upper floor), separate meter available
- Balcony on the upper floor with picket railing, access via office space on the upper floor possible
- Fiber optic connection
- Heated (district heating)
- Windows: Triple glazed
- Shared restrooms for men and women available, tenants can install their own sanitary facilities within the unit
- A mailbox is available for each unit at the main entrance
- Container for paper/cardboard and residual waste is available
- The units are leased off-plan. Viewings will be possible at a later date.
- Use as a car garage (workshop, preparation, etc.) or for the sale of vehicles is not permitted.
Construction work for Stage A has already begun. The units in Stage B/C are expected to be ready for occupancy from January 16, 2028.
Streetbox Otelgfingen offers ideal conditions for companies looking for a functional, well-connected, and future-proof location.
We would be happy to advise you on the various options and look forward to hearing from you.
Changes in execution, areas, equipment, rental prices, dates, as well as construction and project status remain subject to change.
The impressions listed (visualizations and photos) are protected by copyright and may not be used by third parties. Changes remain subject to change.