At the heart of the Meyrin logistics area in Geneva, Industrial and logistics building of approximately 19,000 m2 offering attic laboratory / office space of a total of 4,500 m2 divisible from 150 m2 and which will offer diversified accessibility to your employees and your customers.
This building looks like this:
It is quite possible to modulate according to needs and activities. This is designed to meet Minergie standards. It will present a high level of security (minimum level 3). The floor load is 0.5 to 2.5 tons.
Many parking spaces will be available around the building and in the basement Q3/2021 - Submission of the permit Q3/2022 - Start of construction Q1/2024 - Delivery of the building Plans available.
This building looks like this:
- Ground floor of approx. 4,400 m2, ideal for cross docking: - Usable height of 7 m. - Possible full level access. - 13 unloading docks - Floor load 2.5 T - 4 lifts of 4 tons - 2 elevators of 1800 kg
- 1st and 2nd level of approx. 4,700 m2 each: - Usable height of 4.90 m - Racking height 4 m - Floor load 1.5 T Attic of approx. 4,500 m2 of administrative area and workshop, divisible from 500 m2: - Usable height of 3m - Floor load 1.5 T - Beautiful glazed surface, convertible at the option of the lessee.
- Surface of 4,442 m2 on the ground floor : Divisible from 1,000m2; Price CHF 200.-/m2/year; Useful height of 7.00 meters; Payload 2,500 kg/m2
- Mezzanine (offices) of 536 m2 : Divisible from 140 m2; Price CHF 200.-/m2/year; Useful height of 3.00 meters; Payload 300 kg/m2
- Surface of 4,730 m2 on the 1st floor : Divisible from 1,500m2; Price CHF 180.-/m2/year; Useful height of 4.90 meters; Payload 1,500 kg/m2
- Logistics & workshop area of 4,500 m2 on the 2nd floor : Divisible from 150 m2; Price CHF 170.-/m2/year; Useful height of 4.90 meters; Payload 500-1'500 kg/m2
- Surface Offices & workshops of 4,500m2 on the 3rd floor : Divisible from 150 m2; Price CHF 250.-/m2/year; Useful height of 3.00 meters; Payload 500 kg/m2
- 40 indoor parking spaces : Price of CHF 2,400.-/pl/year
It is quite possible to modulate according to needs and activities. This is designed to meet Minergie standards. It will present a high level of security (minimum level 3). The floor load is 0.5 to 2.5 tons.
Many parking spaces will be available around the building and in the basement Q3/2021 - Submission of the permit Q3/2022 - Start of construction Q1/2024 - Delivery of the building Plans available.